Geyser Hybrid Pump installed at Jonesville, MI

 

 

 

 

 

 

 

 

3) Airlift Pump at the bottom of the clarifier
4) 4" pipe of the Airlift Pump was cut.
2) Vortex Grit Chamber (front) and Classifier (Back)
1) Original design of Vortex-type Grit Chamber with a 4" Airlift Pump

 

 

 

 

 

 

5) Airlift Pump was pulled from the tank.

 

6) Pulled 4" pipe was laid down of the floor.
7) Removed Airlift Pump. A sign of clogging with grease balls was observed.

 

 

 


 

 

8) Glange was welded to the 4" Pipe.

 

9) Two air-intakebarbs were installed to Geyser Pump.

 

 

 

 

 

10) 4" pipe with the flange was installed in the tank.
11) Geyser Hybrid Pump was inserted to the tank.

 

 

 

 

 

 

 

14) Geyser Hybrid Pump successfully transferred Blue sand and gravel from the tank and they were dewatered with the Classifier.

 

 

12) Geyser Hybrid Pump installed in the tank.
13) Blue sand and gravel were poured to the tank for performance test.